Document Library
Document Library
 
CEQA/EIR
EIR Documents Publication
Date
File Size
Notice of Availability of the Draft EIR, Draft Statement of Basis, and Proposed Plan June 2010 40 KB
Draft Environmental Impact Report for the Topock Compressor Station Groundwater Remediation Project, California Department of Toxic Substances Control - Chapters 1 through 3 April 2010 2.8 MB
Draft Environmental Impact Report for the Topock Compressor Station Groundwater Remediation Project, California Department of Toxic Substances Control - Chapter 4 April 2010 39.3 MB
Draft Environmental Impact Report for the Topock Compressor Station Groundwater Remediation Project, California Department of Toxic Substances Control - Chapters 5 through 12 April 2010 4.4 MB
Draft Environmental Impact Report for the Topock Compressor Station Groundwater Remediation Project, California Department of Toxic Substances Control - Appendices April 2010 89.3 MB
Draft Statement of Basis For a Preferred Groundwater Remedy, PG&E Topock Compressor Station Needles, California EPA ID Number CAT080011729 April 2010 1.3 MB
California Environmental Quality Act Initial Study - Template November 2008 325 KB
Article 9. Contents of Environmental Impact Reports November 2008 88 KB
Topock Final Scoping Report August 2008 14.1 MB
 

 

^Top^