Interim Measures 3
Interim Measures 3
 
IM3 Treatment Facility Construction Site
Tanks and Treatment Facility
Injection and Compliance Wells
Piping and Utilities

       
  IM3 Treatment Facility Construction Site
 
View of IM3 Treatment Facility
from Compressor Station

IM3 Treatment Facility

IM3 Treatment Facility
view from South


 
IM3 Treatment Facility
view from KOP3

IM3 Treatment Facility
view from North-Northeast

Completed IM3 Treatment Facility
7-18-2005
 
 
IM3 Construction 4-8-2005

IM3 Construction 3-21-2005

IM3 Construction 3-9-2005
 
 
IM3 Construction 2-25-2005

IM3 Construction 1-28-2005

IM3 Construction 1-19-05
 
 
IM3 Construction 1-06-05

IM3 Construction 12-17-04

IM3 Construction 12-11-04
 
 
IM3 Construction 12-5-04
 
 
 
  Tanks and Treatment Facility
 
Storage Tank Support Structures
11-10-04

Setting treated water
storage tank 1-06-05

Setting treated and raw water
storage tanks 1-06-05
 
 
IM3 treatment facility
east side wall foundation

IM3 Treatment System
Foundation 1-08-05

Discharge Water Storage Tank
11-09-04
 
 
 
 
  Injection and Compliance Wells
 
Compliance well installation
in the injection well field

Compliance well installation
at dusk

Injection well #3
night drilling
 
 
Preparing to install injection
well #3 casing

Water level monitoring
during testing at
injection well #3
 
 
 
  Piping and Utilities
 
Fusing together double-walled
water conveyance pipe

Laying the pipe after fusing
sections together

Electrical Conduits in
Utility Trench 12-17-04
 
 
Placing Sand Cover on
Electrical Conduits 12-20-04
 
       

 

^Top^