Interim Measures 2
Interim Measures 2
       
 
IM2 groundwater extraction
at the MW-20 bench May 2004

IM2 water transport trucks
arrive and depart from
protected enclosure

MW-20 monitoring well
extraction and containment system
 
 
Batch treatment chemical
containers

Groundwater extraction from monitoring wells MW-20
March 2004

Protective berms and
ground liners
 
 
 
 
 
       

 